Project reference2014 · Water engineering and nature conservation
Lake Fertő restoration



- Length
- 76 km
- Duration
- 6 months
- Year
- 2014
About the project
Restoration of Lake Fertő reed beds and water supply channels using dredging and hydraulic excavation.
Operations Water engineering and nature conservation
