Project reference2014 · Pipeline construction
Barátság I DN 450 oil pipeline reconstruction



- Length
- 60 km
- Duration
- 6 months
- Year
- 2014
About the project
Substructure and complete earthworks for replacement reconstruction of the Barátság I DN 450 oil pipeline, with sheet pile support and groundwater lowering using wellpoints and open pumping.
Operations Pipeline construction