2014 · Pipeline construction
Barátság I DN 450 oil pipeline reconstruction
Substructure and complete earthworks for replacement reconstruction of the Barátság I DN 450 oil pipeline, with sheet pile support and groundwater lowering using wellpoints and open pumping.
- Length
- 60 km
- Duration
- 6 months
- Year
- 2014
- Photographs
- 5
01 · Overview
About the project
Substructure and complete earthworks for replacement reconstruction of the Barátság I DN 450 oil pipeline, with sheet pile support and groundwater lowering using wellpoints and open pumping. Length: 60 km. Construction duration: 6 months.
Operations on this project