2008 – Budapest power plant boiler demolition
2008 · Demolition · Recycling

Budapest power plant boiler demolition

Demolition of a steel boiler structure.

Weight
800 tonnes
Duration
3 weeks
Year
2008
Photographs
4
01 · Overview

About the project

Demolition of a steel boiler structure. 800 tonnes. Duration: 3 weeks.

Operations on this project
Project sheet (PDF)
02 · Photographs

From the site


03 · Operations

Work carried out