MOL gas pipeline: border–Beregdaróc–HajdúszoboszlóRequest a quote
2008 – MOL gas pipeline: border–Beregdaróc–Hajdúszoboszló
2008 · Pipeline construction

MOL gas pipeline: border–Beregdaróc–Hajdúszoboszló

Substructure and complete earthworks for the DN 1000 and DN 1400 MOL gas pipeline, with sheet pile support and groundwater lowering using wellpoints and open pumping.

Length
124 km
Duration
18 months
Year
2008
Photographs
16
01 · Overview

About the project

Substructure and complete earthworks for the DN 1000 and DN 1400 MOL gas pipeline, with sheet pile support and groundwater lowering using wellpoints and open pumping. Length: 124 km. Duration: 18 months.

Operations on this project
Project sheet (PDF)
02 · Photographs

From the site


03 · Operations

Work carried out


Group

Our sister company T-Trimmer handles machine sales, hire and parts.

Go to t-trimmer.hu (opens in a new tab)
Enquiries

Planning similar work?

Describe the location, the task and the planned schedule.

Plant yard

Asbóth Oszkár utca 2., 2038 Sóskút, Hungary

Request a quote