Project reference2015 · Water engineering and nature conservation
Partial dredging of the Ács branch of the Danube

- Volume
- 6,300 m³
- Duration
- 12 days
- Year
- 2015
About the project
Partial dredging of the Ács branch between chainage 0+700 and the Danube channel.
Operations Water engineering and nature conservation