2015 · Water engineering and nature conservation
Partial dredging of the Ács branch of the Danube
Partial dredging of the Ács branch between chainage 0+700 and the Danube channel.
- Volume
- 6,300 m³
- Duration
- 12 days
- Year
- 2015
- Photographs
- 1
01 · Overview
About the project
Partial dredging of the Ács branch between chainage 0+700 and the Danube channel. 6,300 m³. Duration: 12 days. Construction year: 2015.
1 photo · Click to enlarge