2015 – Partial dredging of the Ács branch of the Danube
2015 · Water engineering and nature conservation

Partial dredging of the Ács branch of the Danube

Partial dredging of the Ács branch between chainage 0+700 and the Danube channel.

Volume
6,300 m³
Duration
12 days
Year
2015
Photographs
1
01 · Overview

About the project

Partial dredging of the Ács branch between chainage 0+700 and the Danube channel. 6,300 m³. Duration: 12 days. Construction year: 2015.