Project reference2011 · Pipeline construction
Croatian transit DN 800 gas pipeline earthworks



- Length
- 206 km
- Duration
- 16 months
- Year
- 2011
About the project
Substructure and complete earthworks for the Városföld–Bátmonostor–Drávaszerdahely DN 800 gas pipeline, with sheet pile support and groundwater lowering using wellpoints and open pumping.
Operations Pipeline construction