2011 · Pipeline construction
Croatian transit DN 800 gas pipeline earthworks
Substructure and complete earthworks for the Városföld–Bátmonostor–Drávaszerdahely DN 800 gas pipeline, with sheet pile support and groundwater lowering using wellpoints and open pumping.
- Length
- 206 km
- Duration
- 16 months
- Year
- 2011
- Photographs
- 12
01 · Overview
About the project
Substructure and complete earthworks for the Városföld–Bátmonostor–Drávaszerdahely DN 800 gas pipeline, with sheet pile support and groundwater lowering using wellpoints and open pumping. Length: 206 km. Duration: 16 months.