2008 · Pipeline construction

MOL gas pipeline: border–Beregdaróc–Hajdúszoboszló

2008 – MOL gas pipeline: border–Beregdaróc–Hajdúszoboszló
2008 – MOL gas pipeline: border–Beregdaróc–Hajdúszoboszló2008 – MOL gas pipeline: border–Beregdaróc–Hajdúszoboszló
Project page online
Length
124 km
Duration
18 months
Year
2008

About the project

Substructure and complete earthworks for the DN 1000 and DN 1400 MOL gas pipeline, with sheet pile support and groundwater lowering using wellpoints and open pumping.