Project reference2008 · Pipeline construction
MOL gas pipeline: border–Beregdaróc–Hajdúszoboszló



- Length
- 124 km
- Duration
- 18 months
- Year
- 2008
About the project
Substructure and complete earthworks for the DN 1000 and DN 1400 MOL gas pipeline, with sheet pile support and groundwater lowering using wellpoints and open pumping.
Operations Pipeline construction