Project reference2014 · Earthworks and civil engineering · Road construction · Water engineering and nature conservation
OPÁL tank farm



- Volume
- 22,000 m³
- Duration
- 3 months
- Year
- 2014
About the project
Substructure works, road construction and reservoir earthworks for the OPÁL tank farm.
Operations Earthworks and civil engineering · Road construction · Water engineering and nature conservation