2014 · Earthworks and civil engineering · Road construction · Water engineering and nature conservation
OPÁL tank farm
Substructure works, road construction and reservoir earthworks for the OPÁL tank farm.
- Volume
- 22,000 m³
- Duration
- 3 months
- Year
- 2014
- Photographs
- 22
01 · Overview
About the project
Substructure works, road construction and reservoir earthworks for the OPÁL tank farm. 22,000 m³. Duration: 3 months. Construction year: 2014.
Operations on this project
02 · Photographs
From the site
03 · Operations
Work carried out
01
Earthworks and civil engineering
Complete bulk earthworks, civil engineering earthworks, grading, road construction and dredging.
Bulk excavation and fillingRock works and civil engineering earthworks
View operation →02Road construction
Construction of roads and car parks, including stormwater and wastewater drainage systems.
52 earthmoving machines: tracked and wheeled excavators, wheel loaders, dozers, compaction tools and rollersModern levelling systems and measuring instruments
View operation →03Water engineering and nature conservation
Dredging and channel cleaning. Earthworks and channel maintenance for lakes, reservoirs, canals and wetlands using specialist equipment.
Excavators with channel cleaning boomsAmphibious excavators with specialist undercarriages
View operation →
Group
Go to t-trimmer.hu (opens in a new tab)Our sister company T-Trimmer handles machine sales, hire and parts.
Enquiries
Planning similar work?
Describe the location, the task and the planned schedule.
Plant yard
Asbóth Oszkár utca 2., 2038 Sóskút, Hungary