Project reference2013 · Pipeline construction
Slovak transit pipeline



- Length
- 91 km
- Year
- 2013
About the project
Substructure and complete earthworks for the Balassagyarmat–Vecsés DN 800 gas pipeline, with sheet pile support and groundwater lowering using wellpoints and open pumping.
Operations Pipeline construction
