2013 · Pipeline construction
Slovak transit pipeline
Substructure and complete earthworks for the Balassagyarmat–Vecsés DN 800 gas pipeline, with sheet pile support and groundwater lowering using wellpoints and open pumping.
- Length
- 91 km
- Year
- 2013
- Photographs
- 16
01 · Overview
About the project
Substructure and complete earthworks for the Balassagyarmat–Vecsés DN 800 gas pipeline, with sheet pile support and groundwater lowering using wellpoints and open pumping. Length: 91 km. Construction year: 2013.
Operations on this project