Substructure and complete earthworks for the Balassagyarmat–Vecsés DN 800 gas pipeline, with sheet pile support and groundwater lowering using wellpoints and open pumping.

Length
91 km
Year
2013
Photographs
16
01 · Overview

About the project

Substructure and complete earthworks for the Balassagyarmat–Vecsés DN 800 gas pipeline, with sheet pile support and groundwater lowering using wellpoints and open pumping. Length: 91 km. Construction year: 2013.

Operations on this project
Project sheet (PDF)
02 · Photographs

From the site


03 · Operations

Work carried out