2007 · Pipeline construction
MOL DN 800 gas pipeline
Complete earthworks for the MOL DN 800 gas pipeline between Százhalombatta and Pilisvörösvár.
- Length
- 54 km
- Duration
- 12 months
- Year
- 2007
- Photographs
- 5
01 · Overview
About the project
Complete earthworks for the MOL DN 800 gas pipeline between Százhalombatta and Pilisvörösvár. Length: 54 km. Duration: 12 months.
Operations on this project