Százhalombatta–Szajol DN 300 product pipelineRequest a quote
2011 – Százhalombatta–Szajol DN 300 product pipeline
2011 · Pipeline construction

Százhalombatta–Szajol DN 300 product pipeline

Substructure and complete earthworks for replacement sections of the DN 300 chemical product pipeline, with sheet pile support and groundwater lowering using wellpoints and open pumping.

Length
26 km
Duration
4 months
Year
2011
Photographs
3
01 · Overview

About the project

Substructure and complete earthworks for replacement sections of the DN 300 chemical product pipeline, with sheet pile support and groundwater lowering using wellpoints and open pumping. Length: 26 km. Duration: 4 months.

Operations on this project
Project sheet (PDF)
02 · Photographs

From the site


03 · Operations

Work carried out


Group

Our sister company T-Trimmer handles machine sales, hire and parts.

Go to t-trimmer.hu (opens in a new tab)
Enquiries

Planning similar work?

Describe the location, the task and the planned schedule.

Plant yard

Asbóth Oszkár utca 2., 2038 Sóskút, Hungary

Request a quote