Reference list

32 projects with photos and 113 more references, 1994–2024. Generated from the references on this website.

Projects with photos
YearProjectOperationQuantityDuration
2021Fontana shopping centre demolitionDemolition · Recycling15,000 m³—
2021National Athletics Centre demolition and earthworksDemolition · Earthworks · Recycling100,000 m³10 months
2021Citadella concrete bunker demolitionDemolition · Recycling5,800 m³2 months
2019Via Hotel demolitionDemolition · Recycling5,900 m³4 months
2018Taurus tyre factory demolitionDemolition · Recycling130,000 m³6 months
2016Puskás Ferenc Stadium demolition and earthworksDemolition · Earthworks · Recycling50,000 m³8 months
2015National Museum Restoration and Storage CentreDemolition · Recycling12,600 m³3 months
2015Sconto department store demolitionDemolition · Recycling——
2015Hot spinner and hall building demolitionDemolition · Recycling——
2015Partial dredging of the Ács branch of the DanubeWater engineering6,300 m³12 days
2014Ministry of Industry demolitionDemolition · Recycling50,000 m³3 months
2014Barátság I DN 450 oil pipeline reconstructionPipelines60 km6 months
2014Lake Fertő restorationWater engineering76 km6 months
2014OPÁL tank farmEarthworks · Road construction · Water engineering22,000 m³3 months
2013Ferencváros Albert Stadium demolitionDemolition · Earthworks · Recycling50,000 m³3 months
2013Slovak transit pipelinePipelines91 km—
2011Croatian transit DN 800 gas pipeline earthworksPipelines206 km16 months
2011Százhalombatta–Szajol DN 300 product pipelinePipelines26 km4 months
2011Öregturján wetland restorationWater engineering39 ha2 months
2008M1 business park, PátyEarthworks330,000 m³2.5 months
2008Corvinus University building demolitionDemolition · Recycling13,000 m³3 months
2008Budapest power plant boiler demolitionDemolition · Recycling800 tonnes3 weeks
2008MOL gas pipeline: border–Beregdaróc–HajdúszoboszlóPipelines124 km18 months
2007Hankook tyre factory, phase IIEarthworks600,000 m³4 months
2007M0 motorway eastern sectorRoad construction200,000 m³6 months
2007MOL DN 800 gas pipelinePipelines54 km12 months
2006Népliget CenterEarthworks——
2006Eger tobacco factory demolitionDemolition · Recycling50,000 m³2 months
2003Kika BudaörsEarthworks—6 months
2003Main Road 4, Abony bypassRoad construction10 km10 months
2002Rynart BiatorbágyEarthworks200,000 m³12 months
2002Pharma Park Budaörs earthworks and road constructionEarthworks · Road construction50,000 m³2 months

More references

Additional archive jobs
YearJobOperationQuantityDuration
2024Demolition works at the Somlói út building of the Mathias Corvinus Collegium Foundation, BudapestDemolition25,000 m³—
2024Demolition works at Fehérvári út 120-124Demolition260,000 m³—
2024NIPÜF Tatabánya Logistics CentreEarthworks2,200,000 m³—
2024Construction works for the capacity expansion of the Ferencváros-Kelenföld railway line, site organisation, substructure and earthworksEarthworks15,000 m³—
2023Biatorbágy technical schoolEarthworks50,000 m³—
2023Bicske Healthcare Logistics CentreEarthworks90,000 m³—
2022–2023Complete earthworks for ATE outdoor training pitches and earthworks for the associated flood protection structureEarthworks75,000 m³—
2023Biatorbágy Knowledge ParkRoad construction50,000 m³—
2022Preparatory demolition works for ATE outdoor training pitchesDemolition30,000 m³—
2022Preparatory demolitions for the Healthcare Logistics Centre in BicskeDemolition400,000 m³—
2022MTK Football Youth Development CentreEarthworks18,000 m³—
2021Demolition of heated and unheated halls at MVM Paks Nuclear Power Plant, in progressDemolition55,000 m³—
2020Demolition of the former VITUKI building after blastingDemolition62,500 m³3 months
2019MVM Paks Nuclear Power Plant, P2 TE, demolition of buildings in the northern areaDemolition31,000 m³10 months
2019Earthworks for the construction of the new Reserve Command Post, PaksEarthworks1,500,000 m³—
2018Site levelling of the investment area, Paks, embankment, cuttingEarthworks15,000 m³3 months
2017Rózsadomb Panoráma project, demolition of the former SZOT hotel, phase IDemolition30,000 m³2 months
2017Budapest, District XXII, Mária Terézia utca 1-7, demolition of cinemaDemolition85,000 m³1 month
2015Budapest, District XIII, complete demolition of the Volánbusz bus stationDemolition15,000 m³1 month
2012Complete demolition of the office and factory buildings of the flat glass factory in SalgótarjánDemolition115,500 m³2.5 months
2011Securing the working trench with groundwater lowering using vacuum wells during construction of the sewer network of NagykőrösWater engineering4,500 m5 months
2009Budaörs, SOLARIS City, earthworksEarthworks15,000 m³4 months
2009Romanian transit, Algyő-Csanádpalota DN 700 gas pipeline and its facilitiesPipelines47 km—
2008District VIII, Könyves Kálmán körút, K3 office building, earthworksEarthworks2,500 m³3 months
2008District II, Millenáris Park, WPR Omega office building, earthworksEarthworks70,000 m³4 months
2008District XI, Hengermalom utca, Office Garden II, earthworks with sub-base preparationEarthworks18,500 m³2 months
2008District VIII, Nagytemplom utca, apartment building, earthworks, sub-base preparationEarthworks16,000 m³3 weeks
2008District XII, Csörsz utca, demolition of warehouse buildingDemolition16,000 m³2 months
2008Complete demolition of the Baumax store in PécsDemolition7,000 m³2 months
2008Budapest, Millenáris Park (former Ganz), demolition of fire water reservoir, office buildingDemolition2,500 m³3 months
2008Earthworks for Pannon út and its roundabout junctions in Törökbálint, with sub-base preparationRoad construction1 km2 months
2007Earthworks for the 206-room spa and wellness hotel in the Egerszalók valleyEarthworks70,000 m³2 months
2007District XI, Andor utca 24-28, Új-Buda apartment building, earthworks with sub-base preparationEarthworks50,000 m³1 month
2007District IX, corner of Soroksári út and Haller utca, Haller Kert office building, earthworks with sub-base preparationEarthworks40,000 m³3 months
2007Agria Park shopping and entertainment centre in Eger, earthworks with sub-base preparationEarthworks38,000 m³4 months
2007District XIV, Hungária körút, I, Pesti Sütőipari Vállalat bread factory, completeDemolition12,600 m³2 months
2007District XIV, Hungária körút 113-115, demolition of office and residential buildingsDemolition5,700 m³2 months
2007Demolition of the buildings and paved areas at the Émász site in MiskolcDemolition12,600 m³1 month
2007M0, Nagytétény junction, transport tasksRoad construction—2 months
2006District VIII, Szerdahelyi utca, Mátyáskert residential and office building, earthworksEarthworks15,000 m³3 months
2006District II, Pasaréti út 122, Múzeumkert residential park, earthworksEarthworks21,000 m³1 month
2006District XVIII, Királyhágó utca, Magnólia residential park, earthworks with sub-base preparationEarthworks20,000 m³3 weeks
2006District IX, Nagykőrösi út, DHL Logistics Centre, soil replacement, formation of ground level under the hallsEarthworks70,000 m³1 month
2006Complete earthworks for the access road to Agropark HerceghalomRoad construction30,000 m³1 month
2006Main road 4, Vecsés and Üllő bypass section, complete earthworks for the stormwater reservoirRoad construction15,000 m³1 month
2006Main road 51, Szüröki access road, phase II, complete earthworksRoad construction1 km2 months
2006Complete earthworks for the modernisation of the municipal road network of GödRoad construction120 streets2 months
2006District IX, Nagykőrösi út, DHL Logistics Centre, preparatory earthworks for the car park and access roadsRoad construction8,000 m³2 months
2005Budakeszi, National Institute for Medical Rehabilitation, phase II earthworksEarthworks15,000 m³2 months
2005District XI, Kaposvár utca, Óraház office building, earthworksEarthworks65,000 m³3 months
2005Earthworks for the STOP-SHOP store in ÉrdEarthworks20,000 m³4 months
2005District XI, Nagyszőlős utca, BCW office building, earthworksEarthworks18,000 m³3 months
2005District VI, Király utca 8-10, residential and office building, earthworksEarthworks20,000 m³4 months
2005National Institute for Medical Rehabilitation, phase II demolition worksDemolition3,000 m³2 months
2005Main road 4, Vecsés and Üllő bypass section, partial earthwork construction, drainageRoad construction8 km5 months
2005Construction of rapid exit taxiways, Ferihegy Airport Terminal 1Road construction15,000 m³1 month
2005M0 expressway, km 46+100, junction embankment constructionRoad construction75,000 m³6 months
2005Operation of the CAD sand pit in Ecser, partial recultivationRoad construction100,000 m³6 months
2004District VII, Dob utca 64, residential and office building, complete earthworksEarthworks5,000 m³3 months
2004Budaörs, Peugeot Fábián car showroom, complete earthworksEarthworks10,000 m³2 months
2004District XX, Pázsitos residential park, complete earthworksEarthworks15,000 m³2 months
2004District IX, Viola utca 28, residential and office building, earthworksEarthworks80,000 m³2 weeks
2004General contracting of the complete external road network for the OBI store in SzolnokRoad construction1.8 km1 month
2004Cegléd I, full-scale operation of sand pitRoad construction2,200,000 m³—
2003–2004Main road 63 bypassing Székesfehérvár, construction worksRoad construction2,800,000 m³—
2003Duna-Pest Rezidencia houses, Boráros tér, earthworks, sub-baseEarthworks8,000 m³2 months
2003Drug Rehabilitation Centre no. III, District X, Cserkesz utca, earthworks, sub-baseEarthworks10,000 m³3 weeks
2003District IX, Telepy utca 18, apartment building, earthworks, sub-baseEarthworks13,000 m³3 weeks
2003District IX, Mihálkovics utca 10, apartment building, earthworks, sub-baseEarthworks10,000 m³1 month
2003District XI, Nádorliget residential park, buildings A-B, earthworks, sub-baseEarthworks12,000 m³3 weeks
2003District IX, Tűzoltó utca, 132-flat apartment building, earthworks, sub-baseEarthworks30,000 m³2 months
2003District XXII, Cultural Centre, swimming pool building, earthworks with sub-baseEarthworks25,000 m³2 months
2003District XI, Nádorliget residential park, buildings C-D, earthworks, sub-baseEarthworks20,000 m³1 month
2003IVG Infopark, office building "C", earthworks, sub-baseEarthworks20,000 m³2 months
2003District X, Fehér út market hall, earthworks, sub-baseEarthworks25,000 m³2 months
2002Hűvösvölgy STOP-SHOP I, earthworks, sub-base preparationEarthworks50,000 m³12 months
2002Hűvösvölgy STOP-SHOP II, earthworks, sub-base preparationEarthworks40,000 m³4 months
2002Earthworks for Fehérvári út marketEarthworks5,000 m³6 months
2002Sped. Englemayer, site levelling, fill constructionEarthworks5,000 m³2 months
2002Hűvösvölgy STOP-SHOP I, road and car park constructionRoad construction22,000 m³2 months
2002Hűvösvölgy STOP-SHOP II, road and car park constructionRoad construction90,000 m³4 months
2001Earthworks for Népliget bus station, underpass, main building, underground car parkEarthworks90,000 m³1 month
2001District II, Szépilona residential park, complete earthworksDemolition17,000 m³12 months
2001District XIII, Kleopátra-ház, complete earthworks with sub-base preparationDemolition500 m³15 months
2001District XVI, Miskolci út 157, demolition of industrial siteDemolition3,500 m³2 months
2000Earthworks for PRAKTIKER storeEarthworks30,000 m³2 months
2000General earthworks for ÁRKÁD shopping centre, Örs Vezér tereEarthworks50,000 m³8 months
2000Demolition works at the site of R.A. Trade Kft. in BudaörsDemolition30,000 m³2 months
2000Demolition of the market in DunaújvárosDemolition10,000 m³2 months
2000Complete demolition of the PRIMAGÁZ depot in BudaörsDemolition40,000 m³2 months
2000Demolition works for the National Institute for Medical RehabilitationDemolition3,000 m³2 months
2000Kecskemét, Izsáki utca, pavingRoad construction50,000 m³1 month
2000Earthworks for the car park of the TESCO store in BudaörsRoad construction2,800,000 m³6 months
1999Earthworks for MOM ParkEarthworks350,000 m³10 months
1999Earthworks for Campona shopping centreEarthworks35,000 m³15 months
1999Earthworks for Baumax storesEarthworks50,000 m³2 months
1999Earthworks for the Tesco store in BudaörsEarthworks120,000 m³8 months
1999District XIII, Váci út, DUNA PLAZA phase II, demolition, concrete crushingDemolition60,000 m³1 month
1999Track renewal at Déli railway stationRoad construction8,000 m³2 weeks
1998Earthworks for CAMPONA shopping centreEarthworks35,000 m³1.5 months
1998Earthworks for the IBM construction siteEarthworks25,000 m³1 month
1998Lurdy Ház road and car park construction (general contractor)Road construction15,000 m³3 months
1997Earthworks for petrol stationsEarthworks70,000 m³2 months
1997Soil excavation at Lurdy Ház, Mester utcaEarthworks85,000 m³1 month
1997M3 motorway construction worksRoad construction30,000 m³—
1996Earthworks for INTERSPAR storesEarthworks30,000 m³1.5 months
1995Demolition of the Budapest iron foundry, concrete breaking and removalDemolition60,000 m³2 months
1995Budapest iron foundry, construction of service roadsRoad construction100,000 m³2 months
1994Earthworks for the restoration of the Nagymaros hydroelectric power plant, soil excavation, gravel supplyEarthworks74,000 m³3 months
1994Removal of rubble and soil from the Budapest EXPO site in three phasesEarthworks90,000 m³3 months
1994Soil moving during foundation work at RONDO PapírgyárEarthworks15,000 m³1 month
1994Excavation during civil engineering work at ALFA warehouse storeEarthworks16,000 m³3 months
1994Demolition during civil engineering work at ALFA warehouse storeDemolition90,000 m³2 months

Source: foldtrans.hu, “Egyéb projektek” (other projects).

— = not stated in the published reference.